April 13th, 2022

Company Operations Facility + Tactile Equipment Maintenance Facility

Check out one of our previous projects!

‍

Company Operations Facility + Tactile Equipment Maintenance Facility at Joint Base Lewis McChord (JBLM).

‍

JRT was responsible for Full Mechanical + Plumbing, Natural Gas + Compressed Air, & POL Distribution System. The project consisted of 8 buildings & 104,774 sq ft.

‍

This was a LEED Silver Project. LEED (Leadership in Energy and Environmental Design) is the most widely used green building rating system in the world. To achieve LEED certification, a project earns points by adhering to prerequisites and credits that address carbon, energy, water, waste, transportation, materials, health and indoor environmental quality.

‍

We were honored to work with the Army Corp of Engineers on this project!

‍

-

‍

‍

‍

‍

‍